Construction of a 54’ seasonal pier with 6’x18’ seasonal “L” at 21 Scottsdale Road, Centerville as shown on Assessor’s Map 229 Parcel 064.
Proposed foundation and addition to existing single-family house, rebuild retaining walls, add drainage structures for driveway and roof runoff, construct stairs and walkways at 95 Huckins Neck Road, Centerville as shown on Assessor’s Map 252 Parcel 015
The proposed project includes the removal of dislodged fiber rolls, installation of a 290 linear foot fiber roll along the eroding section, and nourishment over the fiber rolls to the beach area, relocation of the existing deck and utilities adjacent to the access steps, removal and replacement of the access steps, and all associated clearing, grading and landscaping required for the proposed Town of Barnstable Conservation Commission 230 South Street Hyannis Massachusetts 02601 AG091724 Page 2 work at 128 Bluff Point Drive, Cotuit as shown on Assessor’s Map 034 Parcel 069. SE3-6212 Continued from 9/10/24 for DEP number and NHESP letter. WC Form received.
August 13, 2024 September 3, 2024