To remove the existing float and construct a new ramp and float at 199 Cedar Tree Neck Road, Marstons Mills as shown on Assessor’s Map 076 Parcel 026. SE3-5906 $31.16
To remove the existing float and construct a new float and ramp along outside of existing pier ell at 167 Cedar Tree Neck Road, Marstons Mills as shown on Assessor’s Map 076 Parcel 068. SE3-5904 $31.16
Replace existing deck with elevated patio; construct new spa, patio, and covered porch; maintain beach; add beach access stairs and stone retainage; landscaping including replacement of invasives with natives, poison ivy control and fence replacement at 24 Flume Avenue, Marstons Mills as shown on Assessor’s Map 061 Parcel 032. $46.74
Install 98 linear feet of vinyl sheet pile retaining wall at 22 Clamshell Cove Road, Cotuit as shown on Assessor’s Map 006 Parcel 009. SE3-5890 Continued from 7/20/21.
Extension of the original Town-owned culvert. The original culvert is approximately 15’ long and has been extended approximately 28’ with 30” HDPE corrugated pipe at 27 Falcon Road, West Barnstable as shown on Assessor’s Map 196 Parcel 032. SE3-5860 Continued from 7/20/21.
Proposed installation of a new “T” shape residential seasonal dock located at 15 Piney Point Drive, Centerville as shown on Assessor’s Map 228 Parcel 155. SE3-5902 Continued from 8/3/21 for the sole purpose of NHESP letter and comments.
A. Chuck Rowland, Sullivan Engineering to discuss Coastal Bank issues at 25 South St., Hyannis, Map 326 Parcel 120.
B. Commission discussion on Bog Partners LLC RDA. – required information for revised plan submission prior to 9/14/21 continuance.