Conservation Commission 06-21-2022

Chapters

REQUESTS FOR DETERMINATION 00:01:00


Mark Schindler & Angela Shen-Hsieh 00:02:00

Mark Schindler & Angela Shen-Hsieh. Manage invasive plant species at 93 Pheasant Way, Centerville as shown on Assessor’s Map 228 Parcel 135. DA-22022 $16.38


NOTICES OF INTENT 00:23:29


David and Mary Mooney 00:23:30

David and Mary Mooney. Raze and rebuild single family dwelling with associated amenities, landscaping, and utilities at 122 Annable Point Road, Centerville as shown on Assessor’s Map 211 Parcel 017. $21.84


John W. Cuming and Jon E. Steffensen, Trustees 00:35:22

John W. Cuming and Jon E. Steffensen, Trustees. Construct and maintain a pool, pool patio within the existing house foundation, replace septic, build addition, remove and relocate AC & Generator, remove shed, add rinse station, remove and reset with new Title 5 system, realign crushed stone driveway, convert existing garage into pool house, wall and steps. Add leaching pit for roof, patio and pool draw down, add landscape bed, expand landing at bottom of existing stairs to connect the stairs, mitigation plantings with the associated grading, utilities and landscaping at 150 Hummock Lane, Cotuit as shown on Assessor’s Map 053 Parcel 027. SE3-6003 $68.25


Angela Y. Hahn 00:54:17

Angela Y. Hahn. Proposed construction of a single-family home and associated site improvements at 150 Bay Road, Cotuit as shown on Assessor’s Map 007 Parcel 018. $19.11


CONTINUANCES 01:02:33


Amended Order - Stanley Davitoria 01:02:34

Amended Order - Stanley Davitoria – SE3-5739 Proposed changes to the original Order of Conditions include the relocated wall, along with a proposed pool, patio, shed, and deck at 55 & 61 Beechwood Road, Centerville as shown on Assessor’s Map 252 Parcel’s 182 and 008. Continued from 5/24/22


Paul Capasso 01:03:58

Paul Capasso. Installation of a new in-ground pool and stone patio at 116 Bay Shore Road, Hyannis as shown on Assessor’s Map 325 Parcel 079. Continued from 6/7/22 for issuance of DEP # only.


Paul Fitzgerald 01:04:56

Paul Fitzgerald – Construction of approximately 102 ft. sloped stone revetment, approximately 67 ft. of vertical plastic bulkhead, and buffer plantings located at 207 Keveney Lane, Cummaquid as shown on Assessors Map 352 Parcel 023. SE3-5972 Continued from 6/7/22.


TAKEN UNDER ADVISEMENT 01:13:54


Tobias Welo 01:13:55

Tobias Welo. Construction of wave break and planting at 25 and 35 Cove Lane, Osterville as shown on Assessor’s Map 052 Parcel 009 and Map 053 Parcel 012 002. SE3-5976. Continued from 6/7/22.



Upcoming air times

There are currently no upcoming air times.